A polished commercial interior completed with precision craftsmanship — bespoke joinery, premium tiling and full electrical integration across 1,800 m² of open-plan workspace.

Hendrex B was engaged to deliver a complete fit-out of a multi-floor corporate headquarters in Blantyre's central business district. The scope demanded zero-downtime phased delivery, working floor-by-floor while the lower levels remained occupied.

Our team installed large-format porcelain tiles throughout open-plan areas, precision-cut glass partitioning, custom-built reception joinery and a full 3-phase electrical distribution system with dedicated server room cooling. Acoustic ceiling tiles were fitted in conference suites to achieve the client's specified noise-attenuation rating.

The project was completed two days ahead of programme, on budget, with a snag list that was closed within 48 hours of handover — a result of our rigorous quality-control checks at each phase gate.

Project highlights

  • 1,800 m² of large-format porcelain tiling
  • Full 3-phase electrical distribution & DB boards
  • Acoustic ceiling system in 6 conference suites
  • Completed 2 days ahead of programme
  • Zero disruption to live lower floors during works
Start Your Project

Want results like
this on yours?

No obligation. No jargon. Just a clear scope and honest pricing within 24 hours.